8791- St. Louis Air Cargo Pavement Reconstruction at St. Louis Lambert International Airport

The project consists of the removal and replacement of the existing pavement and subbase within the limits shown on the plans for Air Cargo Pavement Replacement, resurfacing three existing asphalt parking lots, installation of perimeter fencing and security gates. The new concrete pavement shall be constructed with the same width and profile grade as the existing roadway pavement. The existing storm sewer inlet grates within the pavement replacement section shall be replaced. Electrical work will consist of replacing two lights and providing power and access control to the security gates.
Date Company Contact
1754670629
8/8/25 4:30 pm
Basilico Engineering
3946 Lindell Blvd.
St. Louis, MO 63108
Lawrence Nwachukwu
President
Tel: 314-289-8777
Fax: 314-289-8333
1753774556
7/29/25 7:35 am
Brewster
6321 East Main Street
Maryville, IL 62062
Brett Mueth
Estimate Engineer
Tel: 6183444468
1753662591
7/28/25 12:29 am
Dodge Construction Network
2860 South State Hwy 161
Suite 160 #501
Grand Prairie, TX 75052
Jayalakshmi L
Tel: 413-376-7032
1754920248
8/11/25 1:50 pm
LJ Grants and Proposal
4641 Bessie
St. Louis, MO 63115
Lisa J Smith
Consultant
Tel: 7037980988
1755695179
8/20/25 1:06 pm
Leritz Contracting
2909 Barrett Station Road
St. Louis, MO 63122
Jesse Czerniewski
Project Manager
Tel: 3148212615
Fax: 3148222711
1756118834
8/25/25 10:47 am
Southern Illinois Builders Association
1468 Green Mount Road
O'Fallon, IL 62269
Stephanie Foster
Administrative Assistant
Tel: 6186249055
Fax: 618-624-9065
1755673376
8/20/25 7:02 am
Vision Civil Construction, LLC
11622 Gravois Road
P.O. Box 29246
St. Louis, MO 63126-9998
Justin Hurd
Project Manager/Estimator
Tel: 314-445-2020