8791- St. Louis Air Cargo Pavement Reconstruction at St. Louis Lambert International Airport
The project consists of the removal and replacement of the existing pavement and subbase within the limits shown on the plans for Air Cargo Pavement Replacement, resurfacing three existing asphalt parking lots, installation of perimeter fencing and security gates. The new concrete pavement shall be constructed with the same width and profile grade as the existing roadway pavement. The existing storm sewer inlet grates within the pavement replacement section shall be replaced. Electrical work will consist of replacing two lights and providing power and access control to the security gates.
Plan Holders
Date | Company | Contact |
8/8/25 4:30 pm |
Basilico Engineering
3946 Lindell Blvd.
St. Louis, MO 63108 |
Lawrence Nwachukwu
President
Tel: 314-289-8777
Fax: 314-289-8333
|
7/29/25 7:35 am |
Brewster
6321 East Main Street
Maryville, IL 62062 |
Brett Mueth
Estimate Engineer
Tel: 6183444468
|
7/28/25 12:29 am |
Dodge Construction Network
2860 South State Hwy 161
Suite 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
8/11/25 1:50 pm |
LJ Grants and Proposal
4641 Bessie
St. Louis, MO 63115 |
Lisa J Smith
Consultant
Tel: 7037980988
|
8/20/25 1:06 pm |
Leritz Contracting
2909 Barrett Station Road
St. Louis, MO 63122 |
Jesse Czerniewski
Project Manager
Tel: 3148212615
Fax: 3148222711
|
8/25/25 10:47 am |
Southern Illinois Builders Association
1468 Green Mount Road
O'Fallon, IL 62269 |
Stephanie Foster
Administrative Assistant
Tel: 6186249055
Fax: 618-624-9065
|
8/20/25 7:02 am |
Vision Civil Construction, LLC
11622 Gravois Road
P.O. Box 29246 St. Louis, MO 63126-9998 |
Justin Hurd
Project Manager/Estimator
Tel: 314-445-2020
|