8769-Reconstrct. of Taxilane Charlie from Taxiway S to Taxiway G-Project 2 at STL Lamb. Inter.Airp.

The proposed Work includes full depth removal and reconstruction of PCC taxiway pavement along Taxilane C from Taxiway G to east of Taxiway J and from east of Taxiway P to west of Taxiway C5. Project also includes reconstructing connecting taxiways C6, C2, and C1. Replacement of asphalt shoulder, electrical infrastructure, and storm drainage infrastructure is also included. Installation of new artificial turf islands is also included.
Bid Documents (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
004307-Certification, Anti-Discrimination Against Israel Form-05-10-2022 64.4 KB
004308-Affidavit, Bidder Relationship with City-05-10-2022 32.9 KB
Affidavit E-Verify 135.8 KB
Buy America Certificate of Materials Origin 92.5 KB
Corporation Signature 152.9 KB
DBE Identification Form.xlsx 15.9 KB
DBE Package 06-27-22 320.6 KB
E-Verify Memorandum of Understanding 173.6 KB
Subcontractor List.xlsx 12.8 KB
Specs (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
8769 Specifications 36.0 MB