8769-Reconstrct. of Taxilane Charlie from Taxiway S to Taxiway G-Project 2 at STL Lamb. Inter.Airp.
The proposed Work includes full depth removal and reconstruction of PCC taxiway pavement along Taxilane C from Taxiway G to east of Taxiway J and from east of Taxiway P to west of Taxiway C5. Project also includes reconstructing connecting taxiways C6, C2, and C1. Replacement of asphalt shoulder, electrical infrastructure, and storm drainage infrastructure is also included. Installation of new artificial turf islands is also included.
Plans
(click to expand/collapse)
![](/images/click.png)
Name | Size | ||
8769 Plans | 53.8 MB |