8769-Reconstrct. of Taxilane Charlie from Taxiway S to Taxiway G-Project 2 at STL Lamb. Inter.Airp.
The proposed Work includes full depth removal and reconstruction of PCC taxiway pavement along Taxilane C from Taxiway G to east of Taxiway J and from east of Taxiway P to west of Taxiway C5. Project also includes reconstructing connecting taxiways C6, C2, and C1. Replacement of asphalt shoulder, electrical infrastructure, and storm drainage infrastructure is also included. Installation of new artificial turf islands is also included.
Plan Holders
Date | Company | Contact |
5/11/24 1:29 am |
Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
5/21/24 9:31 am |
MoKan
4666 Natural Bridge St. Louis, MO 63115 |
Kabir Muhammad
Plan Room Manager
Tel: 314-454-9675
|
5/8/24 12:26 pm |
Southern Illinois Builders Association
1468 Green Mount Road O'Fallon, IL 62269 |
Stephanie Foster
Administrative Assistant
Tel: 6186249055
Fax: 618-624-9065
|