8769-Reconstrct. of Taxilane Charlie from Taxiway S to Taxiway G-Project 2 at STL Lamb. Inter.Airp.

The proposed Work includes full depth removal and reconstruction of PCC taxiway pavement along Taxilane C from Taxiway G to east of Taxiway J and from east of Taxiway P to west of Taxiway C5. Project also includes reconstructing connecting taxiways C6, C2, and C1. Replacement of asphalt shoulder, electrical infrastructure, and storm drainage infrastructure is also included. Installation of new artificial turf islands is also included.
Date Company Contact
1715390965
5/11/24 1:29 am
Dodge Data & Analytics 2860 S State Hwy 161
Ste 160 #501
Grand Prairie, TX 75052
Jayalakshmi L
Tel: 413-376-7032
1716283903
5/21/24 9:31 am
MoKan 4666 Natural Bridge
St. Louis, MO 63115
Kabir Muhammad
Plan Room Manager
Tel: 314-454-9675
1715171202
5/8/24 12:26 pm
Southern Illinois Builders Association 1468 Green Mount Road
O'Fallon, IL 62269
Stephanie Foster
Administrative Assistant
Tel: 6186249055
Fax: 618-624-9065