Sugar Loaf

The work consists of the rehabilitation of 16 Sanitary Manholes and the provision of safety grates for 9 Wet Well Lift Stations. The rehabilitation will include complete manhole lining utilizing Epoxy Lining. Work done in preparation of the epoxy lining on each manhole varies, and includes, but is not limited to: cleaning/prep, step removal, chemical grouting, and sealing and cementitious repair. Ancillary, but included in this project, is the rehabilitation work in this project, no excavation or other surface disturbance is anticipated.