13511-015.1 Bissell Point WWTF Foam Suppression System (IR)
Installation of a foam suppression system that is comprised of spray nozzles suspended above the flow channel of the final outfall structure. The system will include a backflow preventor and water service line to a City of St. Louis water main.
Status
Accepting Bids
Prebid Date2/18/21 2:00 pm
Bid Date3/9/21 2:00 pm
Company & Contacts
Metropolitan St Louis Sewer District
Stacey Hunter, shunter@stlmsd.com