Warrenton West Interceptor Sanitary Sewer, Phase 1

Work to be performed under this contract includes the installation of approximately 6,340 LF of 24” gravity sewer, including 515 LF of 24” restrained joint PVC within jack and bored 36” steel casing pipe. Approximately 25 manholes, surface restoration, and other associated work is included. The proposed pipeline will cross Interstate 70. The upstream end of this project will connect to the existing City of Warrenton sewer system south of Interstate 70. The downstream limits of this project will connect to the City of Warrenton’s Fairlane Lift Station, located off Fairlane Circle.