Warrenton West Interceptor Sanitary Sewer, Phase 1

Work to be performed under this contract includes the installation of approximately 6,340 LF of 24” gravity sewer, including 515 LF of 24” restrained joint PVC within jack and bored 36” steel casing pipe. Approximately 25 manholes, surface restoration, and other associated work is included. The proposed pipeline will cross Interstate 70. The upstream end of this project will connect to the existing City of Warrenton sewer system south of Interstate 70. The downstream limits of this project will connect to the City of Warrenton’s Fairlane Lift Station, located off Fairlane Circle.
Date Company Contact
1584103163
3/13/20 7:39 am
Dodge Data & Analytics 830 3rd Avenue, 6th floor
New York, NY 10022
Dodge Data Analytics
Tel: 877-903-1909
1584970850
3/23/20 8:40 am
Horizontal Boring & Tunneling Co. 505 So. River Ave.
PO Box 429
Exeter, NE 68351
Brent Moore
President/ Estimator
Tel: 402-266-5347
Fax: 402-266-5591
1584017572
3/12/20 7:52 am
Lamke Trenching And Excavating 16323 Concord Hill Road
Marthasville, MO 63357
Stephanie Couch
Accounting
Tel: 636-932-4649
Fax: 636-932-4880
1584035866
3/12/20 12:57 pm
Pace Construction 1620 Woodson Rd.
St. Louis, MO 63114
Christopher Finn
Office Engineer
Tel: 314-524-7223
Fax: 314-991-5183
1584475412
3/17/20 3:03 pm
The Driller LLC 5125 E University Ave
Pleasant Hill, IA 50327
Sue Bush
Tel: 515-266-2261
Fax: 515-266-1349
1584398800
3/16/20 5:46 pm
Underground Solutions 13135 Danielson Street Suite 201
Poway, CA 92064
David Reuter
Tel: 816-518-5162
1584995558
3/23/20 3:32 pm
ePlan 4115 S Providence Road Suite 105
Columbia, MO 65203
Raven Webster
Tel: 573-447-7130
Fax: 573-355-5404
1584384987
3/16/20 1:56 pm
iSqFt 4500 Lake Forest Drive
Suite 502
Cincinnati, OH 45242
Todd Ciganek
Senior Content Specialist
Tel: 8003642059
Fax: 8665708187