12021-015.1 INFRASTRUCTURE REPAIRS (REHABILITATION) (2020) CONTRACT B

rehabilitation of approximately 42,480 lineal feet of sanitary sewers varying in size from 6-inches to 60-inches in diameter, utilizing cured-in-place pipe (CIPP) methods.
  Bid Documents (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download to registered users. Log in now
Name Size
12021 Bid Form C Contract Bonds SRF 392.3 KB
12021 NTC with MWBE 680.2 KB
12021 Public Notice 13.6 KB
  Prequalified Primes And Planholders (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download to registered users. Log in now
Name Size
2018-19 Approved Contractor List 6.17.19 63.9 KB
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download to registered users. Log in now
Name Size
12021 specs 15.3 MB