Gravois Greenway: Orlando's to River des Peres Greenway Phase 3

Status

Bidding Closed

Prebid Date4/9/19 2:00 pm

Bid Date4/23/19 2:00 pm

Company & Contacts

Great Rivers Greenway

Lonny Boring, lboring@grgstl.org  

The Orlando’s to River des Peres Greenway – Phase 3 project is a 750-foot-long section of multi-use trail connecting the previously built Phase 1 project, which ends on the south side of Hoffmeister Avenue, and the Phase 2 project which is currently under construction and begins on the west side of Avenue I. The work includes (but is not limited to): earthwork, clearing and grubbing, grading, asphalt and concrete paving, curb and gutter, storm and sanitary sewer construction, installation of a railroad wheel stop, precast concrete boardwalk and foundations, decorative railings, bollards, retaining walls, temporary fencing, traffic control, SWPPP measures, landscaping, and signage and striping.